Palais des Congrès de Nîmes

The new Palais des Congrès de Nîmes has been designed with a strong identity, in the heart of Nîmes. The project will include a 700-seat Auditorium, various committee rooms with different capacities, an exhibition hall and 500-seat dining room on the top floor of the building.

The building will offer a world-class venue for events such as congresses and seminars, increasing the attractiveness of the city and reinforcing the revitalisation and growing ambitions of the center.

The two buildings are connected by a gateway, over a pedestrian street in the old town, a preserved area with several antique monuments. It is also adjacent to the recent Musée de la Romanité and its archaeological garden: this unique area is a perfect example of the economic and touristic development of Nîmes. The architectural project is also defined by an ambitious environmental approach, to guarantee sustainable development and long-term cost control.

To fit seamlessly in the historical and dense context of the city center, the double curvature façades are pushed back at several points, to free up space. The movements of the shell are creating undulations and forge the project identity.

CLIENT

City of Nîmes

LOCATION

Nîmes, France

COMPLETED

In Progress


Our Scope

Marshall Day Acoustics provided full acoustic design services for the project.

In close collaboration with the design team and the client, Marshall Day Acoustics developed a singular and intuitive building, for both conference attendees and local residents. The building makes the most of the rich historical heritage but offers a modern and welcoming meeting point, in dialogue with the old town.


CHALLENGES

Due to a very dense urban environment, the sound insulation of the Auditorium is one of the main challenges for the project. The envelope is designed to contain high amplified sound levels, without impacting the residential area nearby, only ten meters from the project's façades.

The solution to welcome a large variety of events in the main Auditorium is a 3D immersive sound system, which will offer the users endless possibilities and configurations for existing and future audio environments.

Construction began in 2022, and the opening is scheduled for 2025.



PROJECT TEAM


RELATED PROJECTS

Next
Next

Te Tupu Ngātahi Supporting Growth